A little more progress in the 3rd bedroom!  These pictures represent 2 different work days.  The first two pictures are kind of like a spot the difference game:
before

after
There is another beam added next to the existing ceiling.  Also there are brackets on the trusses - technically the trusses were just sitting on the support beams, but the floor was enough to hold them firmly in place.  Now they also have brackets that would keep them there even without the floor.

This is also from the same day - the two holes jack-hammered into our foundation (back in July!) now have rebar rods in them. 

The second work day was all electrical prep work.  None of the wires are actually on yet.
Light switch to be.

One of the future outlet sites.
The first day we took a marina walk with some friends:

And the second day we just ran errands - which is not exactly easy with 4 children!